"I consider it each time a challenge to make all technical aspects like civil works, park cabling and the wind turbines seamlessly fit each other."

Gerhard van Deuveren - Senior Project Engineer Topwind

The right support whenever needed

The development, building and long-term windfarm upkeep is integral part of your core business, and this requires new decisions and fresh solutions continuously. Topwind in other words offers the right dedicated technical support whenever needed.

News

The Topwind team recently welcomed Micky van der Wind (Project Manager), Michel van Achthoven (Site Manager), Her Van Doorn (Techincal Expert), Kevin Van Der Mark (System Engineer), Willem Lam (Asset Manager) and Henriette Van loo (Technical Administrator).

Windfarm Oostpolder. A beautiful project in the northern parts of the Netherlands. Oostpolder is an initiative of local farmers and entrepreneurs, which decided to use their land to produce sustainable energy.

Langs de A2 is Topwind in opdracht van WeertEnergie en Eneco, bezig met het realiseren van windpark Weert. Hier was het met regulier transport niet mogelijk om de bladen van de windturbines op locatie te krijgen. In samenwerking met Enercon is er een Blade Lifter ingezet.