Topwind finished the construction phase of the turbine in Eemshaven in October 2021. Ramon Jillings has supervised the construction over the past few months for Windpower B.V. The Enercon turbine is now operational.
Windfarm M06 has been repowered from a single Vestas V90 turbine to a new Enercon E-136 turbine. The decision was made a few years ago and now the new turbine is clearly visible near the waterside at Eemshaven. The Enercon E-136 has a power of 4.5MW, a hub-heigt of 132 meter and a rotor diameter of 136 meter.